CORE GRASS

Protecting grass during Corfe Castle’s conservation works.

CORE supplied 180m² of rubber grass-protection mats and 700 fixing pegs for Stonewest’s conservation works at Corfe Castle.

CORE COMMERCIAL, CORE GRASS

Gravel stabilisation for Sheffield Park Estate.

CORE supplied gravel stabilisation, geogrid and grass reinforcement for landscape and access surfaces within the Sheffield Park estate.

CORE COMMERCIAL

1,360m² of stabilised gravel parking at The Sunray.

CORE supplied 1,360m² of CORE COMMERCIAL through Jewson and Gibbs & Dandy for gravel parking at The Sunray in Osmington.

CORE DRIVE, CORE EDGE, CORE GRASS

Stabilised gravel paths and drives at Willingcott Valley.

CORE supplied gravel stabilisation, grass reinforcement and 440 metres of steel edging for Willingcott Valley’s holiday landscape in North Devon.

CORE PRO EDGE

580 metres of aluminium edging at Itchen Valley Country Park.

580 metres of CORE PRO EDGE define paths and planting around the renewed visitor spaces at Itchen Valley Country Park.

CORE PRO EDGE

Aluminium edging shapes the Weston Play Zone at IWM Duxford.

CORE PRO EDGE aluminium edging defines the curved paths and surfaces of the Weston Play Zone at IWM Duxford, designed by Davies White.

CORE DATUM EDGE

1,100 metres of Corten edging at Booths Park.

Approximately 1,100 linear metres of 150mm Corten CORE DATUM EDGE define the flowing paths, lawns and planted beds at Booths Park in Knutsford, delivered by…

CORE PRO EDGE

THE RESERVE CHESTER ZOO.

CORE DRIVE grids were installed beneath the extensive gravel approaches at Voller Gardens, creating stable, porous driveways that complement the two luxury Camberley homes while…

CORE DRIVE

NATTA HOMES VOLLER GARDENS.

CORE DRIVE grids were installed beneath the extensive gravel approaches at Voller Gardens, creating stable, porous driveways that complement the two luxury Camberley homes while…

CORE PRO EDGE

MAYLIM OXFORD NORTH.

More than 1,500 linear metres of CORE PRO EDGE aluminium edging were installed across Oxford North’s public realm, creating consistent straight lines and sweeping curves…

CORE TRP

HORAN CONSTRUCTION NORTH ROAD CYCLEPATH, CARDIFF.

Over 8,500 m² of 100 mm CORE TRP created a no-dig, load-spreading foundation for Cardiff’s 1.5 km Blackweir cyclepath, protecting mature tree roots while supporting…

CORE TRP

HORAN CONSTRUCTION SOPHIA GARDENS CYCLEPATH & FOOTPATH.

CORE TRP provided a no-dig, load-distributing foundation for Cardiff’s Cycleway 4.1 through Sophia Gardens, helping protect mature tree roots while creating a durable, free-draining route…

Copyright CORE 2026 Website design and marketing by Unity Online

Payment Methods