North Road Cyclepath, Cardiff

North Road Cyclepath, Cardiff
LOCATION
CARDIFF
PRODUCTS USED
CORE TRP

PROJECT OVERVIEW

Cardiff Council commissioned a new 1,500 m cyclepath and footpath extending from Blackweir Ambulance Station to Excelsior Road. The alignment passes through a wooded corridor beside mature trees. More than 8,500 m² of 100 mm CORE TRP was specified to create a no-dig, load-spreading formation beneath the porous macadam surface.

KEY REQUIREMENTS

The 1.5 km route had to provide a durable, accessible surface for cyclists and pedestrians while safeguarding mature trees along the wooded alignment. The build-up needed to minimise excavation and soil compaction, maintain drainage through the root zone and support regular active-travel use.

North Road Cyclepath, Cardiff

THE SOLUTION

Following consultation with Horan Construction, CORE specified the 100 mm TRP system for the anticipated pedestrian and cycle loading. Panels were installed along the tree-sensitive corridor, filled with free-draining aggregate and overlaid with porous macadam. The completed no-dig build-up distributed surface loads above the existing soil while delivering a smooth, hard-wearing route from Blackweir to Excelsior Road.

EXPLORE MORE CORE PROJECTS

See how CORE products shape other spaces.

PLANNING A SIMILAR PROJECT?

Speak to our team about the right CORE products for your project.

Copyright CORE 2026 Website design and marketing by KEATESMEDIA & UnityOnline

Payment Methods