← All case studies

CORE DRIVE, CORE TRP

Foxley Lane, Purley

Foxley Lane, Purley
LOCATION
PURLEY
CLIENT
CR8 THREE LTD
CONTRACTOR
VISION CONSTRUCT
PRODUCTS USED
CORE TRP; CORE DRIVE

PROJECT OVERVIEW

At Foxley Lane in Purley, 41 affordable homes sit among retained mature trees. Vision Construct delivered the development for CR8 Three Ltd, working with OB Architecture. Access and parking had to fit the established landscape.

KEY REQUIREMENTS

Provide stable access and parking in a tree-rich setting, with a root-sensitive supporting layer and a permeable gravel finish suited to everyday residential use.

Foxley Lane apartments seen through the established trees.

THE SOLUTION

CORE supplied 1,260m² of CORE TRP for cellular support within the pavement build-up, together with 940m² of CORE DRIVE 50-35 HD and 70m² of CORE DRIVE 40-30. The TRP layer helps spread loads over rooting areas; the surface grids contain gravel under everyday use.

Membranes, geogrid and fixings completed the supply. Construction photography shows the cellular layer beside a retained tree before the landscape was finished.

EXPLORE MORE CORE PROJECTS

See how CORE products shape other spaces.

PLANNING A SIMILAR PROJECT?

Speak to our team about the right CORE products for your project.

Copyright CORE 2026 Website design and marketing by Unity Online

Payment Methods