← All case studies

CORE TRP

Bodymoor Heath

Bodymoor Heath
LOCATION
BODYMOOR HEATH
CLIENT
ASTON VILLA FOOTBALL CLUB
CONTRACTOR
O’BRIEN CONTRACTORS
PRODUCTS USED
CORE TRP

PROJECT OVERVIEW

Aston Villa’s Academy redevelopment at Bodymoor Heath needed access works around retained trees. CORE supplied 1,200m² of CORE TRP through Keyline for O’Brien Contractors’ wider training-ground improvements.

KEY REQUIREMENTS

The access build-up needed to distribute vehicle loads and limit excavation around retained trees, while supporting drainage through the root zone on an active sports site.

Training pitches and academy facilities at Bodymoor Heath.

THE SOLUTION

The cellular layer sits above existing ground and confines free-draining aggregate. This helps distribute vehicle loads across a wider area while limiting excavation around the trees. It provides a supporting layer for the finished access surface within the coordinated pavement build-up.

EXPLORE MORE CORE PROJECTS

See how CORE products shape other spaces.

PLANNING A SIMILAR PROJECT?

Speak to our team about the right CORE products for your project.

Copyright CORE 2026 Website design and marketing by Unity Online

Payment Methods